    We have been supper busy getting all our work finished before we come off on Christmas and with a full January and February things don’t seem to be slowing down any!

    Here are some before and after pictures of work from the past few weeks

    This wall wasn’t tied into the wall running from the building and had managed to push the gas pipe that runs along it so far that it had started to leak! so we took the wall down and rebuilt it away from the gas pipe and tied the whole thing together with stainless steel ties.

    IMG_1758 IMG_1759 IMG_9185 IMG_9189 This was a job we undertook in Broughty Ferry(Dundee) we removed all the old cement pointing and repointed with Lime Mortar Steps after repointing R Steps before repointing L Steps before repointing R Wall after repointing Wall before repointing