- 25 Jun
Work Ending 25/06/2016
Hello everyone! its been a while but we have be very very busy trying to get through as much work as possible.
We had a existing customer that had been getting water ingress and we managed to pin point it to the old do-cot on the building. We made 3 stone’s to fill in where the water has been getting in as well as putting a damp proof behind the stones to allow no further ingress.
These stones are from start to finish
1. Cut Block 2. squared and splays and stop carved on
3. starting to Drove the stone to the angle to match existing 4. Finished stone ready to go in placeTwo window slapping that needed to match the existing building
This is the finished Garage that we have been working on a lot of work but we think its turned out great
and so happy the customer is pleased with it.These are the Pillars for the drive opening we made the pillars out of concrete block and covered them with Lithomex to make then look like the existing stone pillars, This cut the cost massively rather than making them out of Stone and they look like they have been there as long as the original!!
Just the caps to make now!This is the finished fire surround made from Cop Crag sandstone all made and fitted by Rocked Out Stone one of our existing customers had seen a fire surround on there travels that they really like and took a photo and asked it was something that we could do! and here it is. Nothing makes me smile wider than when the customer is over the moon with the work that we do.
About the Author
Scott J