    Hello everyone! its been a while but we have be very very busy trying to get through as much work as possible.

    We had a existing customer that had been getting water ingress and we managed to pin point it to the old do-cot on the building. We made 3 stone’s to fill in where the water has been getting in as well as putting a damp proof behind the stones to allow no further ingress.

    IMG_0340

    These stones are from start to finish
    1. Cut Block 2. squared and splays and stop carved on
    3. starting to Drove the stone to the angle to match existing 4. Finished stone ready to go in place

    IMG_0464 IMG_0465 IMG_0466 IMG_0467

    Two window slapping that needed to match the existing building

    IMG_0507 IMG_0512

    This is the finished Garage that we have been working on a lot of work but we think its turned out great
    and so happy the customer is pleased with it.

    IMG_0469  IMG_0476 IMG_0478 IMG_0481 IMG_0484 IMG_0488

    These are the Pillars for the drive opening we made the pillars out of concrete block and covered them with Lithomex to make then look like the existing stone pillars, This cut the cost massively rather than making them out of Stone and they look like they have been there as long as the original!!
    Just the caps to make now!

    IMG_0597 IMG_0599 IMG_0602 IMG_0606 IMG_0615 IMG_0607 IMG_0608 IMG_0609 IMG_0610 IMG_0612 IMG_0614 IMG_0617 IMG_0618

    This is the finished fire surround made from Cop Crag sandstone all made and fitted by Rocked Out Stone one of our existing customers had seen a fire surround on there travels that they really like and took a photo and asked it was something that we could do! and here it is. Nothing makes me smile wider than when the customer is over the moon with the work that we do.

    IMG_0619 IMG_0620 IMG_0621 IMG_0622 IMG_0623 IMG_0624

     

    Leave a comment